Gen ATM / Integration

Integration is a project, not a footnote.

Every external interface gets its own plan, its own environments, its own test cases and its own exit criteria. The workstream runs in parallel with the product phases and gates each go-live.

4.2 · Communication matrix

What talks to what.

Interfaces in and out of the ATM layer
SourceDestinationProtocolPurpose
ATMGen ATM NGK 2.0 ATM ServiceNDC over TCP/TLSTerminal driving, transactions, EJ
ATM ServiceCARD PRIME D 3.0REST / internal ISO 8583Cardholder, status and limits lookup (lateral)
ATM ServiceT-NETISO 8583 / internal APION-US continuation, OFF-US outgoing forwarding
T-NETScheme / networkISO 8583 certified linkOFF-US incoming and outgoing, clearing
CARD PRIME D 3.0HSMHost command channelPIN, CVV and key operations
CARD PRIME D 3.0SMS / e-mail gatewaySMPP / SMTP / RESTAdvice, OTP, alerts

Workstreams

Nine of them, each with an owner.

Integration & certification workstreams
WorkstreamScopeInterfaceResponsibility
ATM (NCR, GRG)Configuration, NDC download, EJ formats, EPP key injection, XFS validationNDC / XFSTantraFino + ATM vendors
HSMReadiness, key ceremonies, PIN and CVV services, key loadingHost commandsTantraFino + HSM vendor
Core bankingAuthorization, posting, reversals, GL mapping, end of dayISO 8583 / RESTTantraFino + CBS vendor
Scheme / networkIncoming and outgoing authorization and clearing certificationISO 8583 certifiedTantraFino + scheme
AMLScreening hook, alert routingREST / ISO hookTantraFino + AML vendor
SMS / e-mailAdvice, OTP, alertsSMPP / SMTP / RESTTantraFino + provider
KIOSKOnboarding, KYC and issuance journeyRESTTantraFino + KIOSK vendor

Certification

What has to pass before anyone goes live.

ATM estate

EPP key injection under dual control with the ATM vendors, XFS validation per model, NDC download verified, EJ format confirmed for each vendor.

Scheme

Certification for OFF-US incoming and outgoing authorization and clearing, scheduled against the scheme calendar.

EMV

Card profile certification for personalized and instant cards, contact and contactless.

PCI DSS

Alignment of the cardholder data environment, with formal assessment by the institution's QSA and support from our side.

What we need from you

Connectivity and firewall rules per the communication matrix; vendor contacts and contracts for core banking, scheme, AML, gateways, KIOSK and embossing; non-production environments and test data; and named participants for each certification.

Dependencies

Two honest caveats.

XFS depth varies by model

How much a terminal reports about its own devices depends on the model and firmware. EJ formats are confirmed per vendor during the design phase, and the monitoring profile follows what the estate can actually tell us.

Phase 2 follows the scheme calendar

OFF-US dates depend on scheme certification slots, not on our readiness. We plan against the published calendar and book slots as early as the membership allows.

Next step

Bring your estate onto one console.

Send us your terminal mix, cassette configuration and per-ATM currency plan. We will come back with a driving and monitoring design, a sizing note and a delivery schedule.